Acumulación de sedimentos del embalse de Tulumayo de la Central Hidroeléctrica Chimay – Propuesta de solución

dc.contributor.advisorUribe Laines, Oscar Alberto
dc.contributor.authorAbello Montoya, Augusto
dc.contributor.authorRodríguez Paucar, Paul Enzon
dc.contributor.authorVega Pérrigo, Adrián José
dc.contributor.authorYurivilca Poma, Marco Antonio
dc.date.accessioned2025-08-07T20:19:46Z
dc.date.available2025-08-07T20:19:46Z
dc.date.created2025-04
dc.date.issued2025-08-07
dc.description.abstractEl presente estudio se desarrolla en la empresa Orygen Perú1 para abordar las restricciones operativas generadas por la acumulación continua de sedimentos en el embalse Tulumayo (producto del aporte de sedimentos de los ríos Uchubamba, Marancocha y Comas), el cual al inicio de las operaciones en el año 2000 registraba 2,100,000m 3 de almacenamiento de agua, de la cual el volumen útil correspondía a 1,500,000 m 3 . Según los resultados del monitoreo de caudal y hábitat en el área de influencia de la central hidroeléctrica Chimay realizado el 2024, en octubre del 2024 alcanzó 1,178,667.30 m 3 , lo que representa una reducción del 43.87% de la capacidad total del embalse y 21.4% de la capacidad útil del embalse. De acuerdo con los resultados de los monitoreos realizados, la reducción promedio de la capacidad útil representa una disminución del 7.83% de la capacidad útil del embalse, lo cual impacta en la producción de electricidad reduciéndola, así como en el cumplimiento de su compromiso inmediato con la sostenibilidad, además de afectar la imagen corporativa de la empresa Chinango S.A.C., cuyo capital mayoritario es de Orygen Perú, así como su compromiso inmediato con la sostenibilidad, además de afectar la imagen corporativa de la empresa Chinango S.A.C., (en adelante Chinango), operadora de la Central Hidroeléctrica Chimay, cuyo capital mayoritario es de Orygen Perú. Por otra parte, la disminución de la capacidad del embalse afecta los resultados financieros de Chinango S.A.C., al generarse un incremento en costos operativos, toda vez, que esta condición implica incrementar la frecuencia de mantenimientos de la central. Para caracterizar el problema, se emplearon herramientas como el modelo de las cinco fuerzas de Porter, el análisis PESTEL y diagrama de Ishikawa, encontrando que las causas raíces del problema de sedimentos en el embalse Tulumayo es la falta de control de los sedimentos que llegan al embalse y los métodos de operación, siendo prioritario gestionar los sedimentos que llegan al embalse para lograr recuperar parte o todo el volumen perdido y posteriormente modificar los métodos de operación para conservar lo recuperado, así como mitigar el crecimiento del impacto a las comunidades ubicadas en la cola del embalse, con pérdida de sus tierras en cada temporada. Analizando el contexto anterior, se ofrecen distintas alternativas de solución para el problema de sedimentos mediante la canalización del río Uchubamba (que converge al embalse Tulumayo) a fin de gestionar y controlar la distribución de sedimentos de manera eficiente. Entre estas alternativas se tienen: el dragado, la extracción con maquinaria, el encausamiento con gaviones y el encausamiento sin gaviones; para así recuperar de forma progresiva el volumen útil perdido y a la vez aumentar la producción de energía en aproximadamente 13,900 megavatios anualmente, con un VAN esperado de S/ 39,790,711 y un VAN social de S/ 316,103. La línea de investigación del presente proyecto se centra en: “Gestión, sostenibilidad y responsabilidad organizacional en el Perú”.
dc.description.abstractThe present study is developed in the company Orygen Peru based on the problems raised by the continuous accumulation of sediments in the Tulumayo reservoir (due to the transport of sediments from the Uchubamba, Marancocha and Comas rivers), which at the beginning of the operations in the year 2000 recorded 2,100,000 m 3 of total water storage capacity and as of October 2024 it is 1,178,667.30 m 3 (according to the flow and habitat monitoring in the area of influence of the hydroelectric power plant Chimay – december 2024), which represents a 43.87% reduction in the total capacity of the reservoir. With the useful volume of the reservoir being 1,500,000 m 3 , this reduction represents a 20.6% decrease in the useful capacity of the reservoir, which results in a lower production of electricity and at the same time affects the corporate image of the company Chinango S.A.C., whose majority capital is owned by Orygen Peru, as well as its immediate commitment to sustainability and the residents who receive its services. On the other hand, the decrease in the capacity of the reservoir affects the financial results of Chinango S.A.C., by generating an increase in operating costs, since this condition implies increasing the frequency of maintenance at the plant. To characterize the problem, tools such as the Porter five-force model, PESTEL analysis and Ishikawa diagram were used, finding that the root causes of the sediment problem in the Tulumayo reservoir are the lack of control of the sediments that reach the reservoir and the operating methods, being important to first manage the sediments that reach the reservoir to recover part or all of the lost volume and then modify the operating methods to conserve what was recovered, as well as mitigate the growth of the impact on the communities located at the tail of the reservoir, with loss of their lands in each season. Analyzing the previous context, different solution alternatives are offered to address the sediment problem with the channeling of the Uchubamba River (which converges to the Tulumayo reservoir) to manage and control the distribution of sediments efficiently. These alternatives include: dredging, extraction with machinery, channeling with gabions and channeling without gabions; in order to progressively recover the lost useful volume and at the same time increase energy production by approximately 13,900 megawatts annually, with an expected NPV of S/ 39,790,711 and a social NPV of S/ 316,103. The research line of this project focuses on: “Management, sustainability and organizational responsibility in Peru”.
dc.identifier.urihttp://hdl.handle.net/20.500.12404/31402
dc.language.isospa
dc.publisherPontificia Universidad Católica del Perúes_ES
dc.publisher.countryPE
dc.rightsinfo:eu-repo/semantics/closedAccess
dc.subjectConsultores de empresas
dc.subjectPlanificación estratégica
dc.subjectResponsabilidad social de las empresas
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#5.02.04
dc.titleAcumulación de sedimentos del embalse de Tulumayo de la Central Hidroeléctrica Chimay – Propuesta de solución
dc.typeinfo:eu-repo/semantics/masterThesis
renati.advisor.dni10487319
renati.advisor.orcidhttps://orcid.org/0000-0001-9689-5213
renati.author.dni09638896
renati.author.dni10456258
renati.author.dni72936290
renati.author.dni40775085
renati.discipline711017
renati.jurorLazarte Aguirre, Luz Andrea
renati.jurorUribe Laines, Oscar Alberto
renati.jurorVeliz Palomino, Jose Carlos
renati.levelhttps://purl.org/pe-repo/renati/level#maestro
renati.typehttps://purl.org/pe-repo/renati/type#tesis
thesis.degree.disciplineAdministración de la Energía
thesis.degree.grantorPontificia Universidad Católica del Perú. CENTRUM
thesis.degree.levelMaestría
thesis.degree.nameMaestro en Administración de la Energía

Archivos

Bloque original

Mostrando 1 - 2 de 2
Cargando...
Miniatura
Nombre:
Acumulación de sedimentos del embalse de Tulumayo de la Central Hidroeléctrica Chimay – Propuesta de solución.pdf
Tamaño:
2.39 MB
Formato:
Adobe Portable Document Format
Descripción:
Texto completo
Cargando...
Miniatura
Nombre:
Reporte Turnitin_Abello.pdf
Tamaño:
289.58 KB
Formato:
Adobe Portable Document Format
Descripción:
Reporte de originalidad

Bloque de licencias

Mostrando 1 - 1 de 1
Cargando...
Miniatura
Nombre:
license.txt
Tamaño:
1.71 KB
Formato:
Item-specific license agreed upon to submission
Descripción: