dc.description.abstract | La minería de activos digitales es un proceso digital, en el cual equipos de cómputo de
alto desempeño son vinculados a una red específica para el procesamiento de operaciones
matemáticas altamente complejas para la validación de transacciones, que posteriormente son
incorporadas a una cadena de bloques principal. En esta línea, los mineros, propietarios de los
equipos de cómputo, reciben una recompensa pagada en la misma moneda procesada. Es preciso
resaltar que todo este proceso requiere del suministro de altos niveles de energía eléctrica para
los equipos de cómputo.
Debido al requerimiento intensivo de energía eléctrica, los mineros requieren tener
acceso a fuentes de energía que puedan soportar la demanda requerida a precios competitivos
para minimizar los costos de producción del minado digital. Este hecho, representa una
restricción al crecimiento de las operaciones actuales de Tecnomine, empresa peruana que opera
en la industria de las criptomonedas, debido a la limitación de la capacidad de electricidad en su
planta. Adicionalmente a ello, al estar vinculados a operaciones con criptomonedas, este tipo de
negocios son calificados de alto riesgo por la volatilidad inherente de las criptomonedas, lo cual
limita las fuentes de financiamiento para el crecimiento de sus operaciones.
Es así como, a partir del análisis y diagnóstico realizado, se plantearon tres opciones para
que Tecnomine pueda expandir sus operaciones implementando un proyecto modular de minería
de Bitcoin. Estas opciones fueron analizadas financieramente, concluyendo que la mejor opción
para la expansión de Tecnomine está centrada en el proyecto modular de minería de BTC de
2MW que considera el suministro directo del Sistema Eléctrico Interconectado Nacional (SEIN)
a través de un PPA, ya que esta alternativa presenta los mejores resultados en términos de VAN
y TIR, además de tener el menor requerimiento de inversión que los escenarios 1 y 2. | es_ES |
dc.description.abstract | The mining of digital assets is a digital process where high-performance computing
equipment is linked to a specific network to solve high-complex math operations, to be able to
validate trading transactions (buy and sell) among users. Once the transactions are validated, the
entire block is added to the main blockchain. As a result, the owners of the computing systems
get a reward for the work done in the same currency system. It’s important to mention that this
complex process is energy-intensive, so computing equipment requires a reliable and high-
demand source of power.
In this context, the miners are required to have access to energy providers or sources that
can supply electricity at competitive prices, so the production costs of digital mining can be
minimized. This fact represents a restriction for the current operations of Tecnomine which is a
Peruvian company involved in the cryptocurrencies industry, due to limitations on the power
supply capacity in its plant. Likewise, this industry is frequently qualified as a high-risk business
because of the volatility of these assets, so the finance sources are limited to support the
operation's growth.
For that reason, three scenarios to develop a modular BTC mining plant were analyzed to
allow the expansion of current Tecnomine operations. So, a financial assessment was carried out
to evaluate each alternative concluding that the best option for the implementation of a 2MW
BTC mining plant was the one which considered to be supplied directly from the SEIN power
network through a PPA. As a result, this scenario got the best results in terms of net present
value (NPV) and internal rate of return (IRR) and requires less investment than scenarios 1 and
2. | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Pontificia Universidad Católica del Perú | es_ES |
dc.rights | info:eu-repo/semantics/openAccess | es_ES |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/2.5/pe/ | * |
dc.subject | Sistemas de energía eléctrica--Perú | es_ES |
dc.title | Evaluación técnico – financiera de alternativas para optimizar el costo energético de una empresa especializada en la minería de activos digitales en el Perú | es_ES |
dc.type | info:eu-repo/semantics/masterThesis | es_ES |
thesis.degree.name | Maestro en Administración de la Energía | es_ES |
thesis.degree.level | Maestría | es_ES |
thesis.degree.grantor | Pontificia Universidad Católica del Perú. CENTRUM | es_ES |
thesis.degree.discipline | Administración de la Energía | es_ES |
renati.advisor.dni | 49011442 | |
renati.advisor.orcid | https://orcid.org/0000-0003-2193-3830 | es_ES |
renati.author.dni | 47577739 | |
renati.author.dni | 07485481 | |
renati.author.dni | 46394695 | |
renati.author.dni | 42011276 | |
renati.discipline | 711017 | es_ES |
renati.juror | Núñez Morales, Nicolás Andrés | es_ES |
renati.juror | Arana Barbier, Pablo José | es_ES |
renati.juror | Sánchez Torino, Luis Renato | es_ES |
renati.level | https://purl.org/pe-repo/renati/level#maestro | es_ES |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_ES |
dc.publisher.country | PE | es_ES |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#5.02.04 | es_ES |