dc.contributor.advisor | Bazan Tejada, Carlos Armando | |
dc.contributor.author | González Sánchez, Miguel Guillermo | |
dc.contributor.author | Luque Botto, Carlos Augusto | |
dc.contributor.author | Martínez Arboleda, Guillermo Arturo | |
dc.contributor.author | Paredes Loayza de Bedoya, Alice Paola | |
dc.date.accessioned | 2023-03-24T17:32:40Z | |
dc.date.available | 2023-03-24T17:32:40Z | |
dc.date.created | 2023 | |
dc.date.issued | 2023-03-24 | |
dc.identifier.uri | http://hdl.handle.net/20.500.12404/24527 | |
dc.description.abstract | SIDERPERU es una empresa que pertenece al grupo Gerdau S.A. conocida como a
nivel mundial como una de las principales empresas proveedoras de aceros, dado que se
comercializan sus productos en cinco continentes y atienden a los sectores de construcción
civil, industria, minería, agropecuaria y automotriz. El presente business consulting tiene
como objetivo determinar que provocó la pérdida relacionada con el peso métrico del
producto en el proceso de fabricación de barras de construcción, especialmente con la
necesidad de acercarse al -6% sin salirse de la norma NTP341.031 G60 para poder optimizar
el uso de la materia prima. Para lograr la identificación de este problema, fue preciso que se
dieran reuniones entre el grupo de consultores y los gerentes relacionados con el proceso de
fabricación de las barras de construcción, así como el diseño de diferentes matrices y el
Diagrama de Ishikawa para mostrar las causas halladas. Se determinó que la falta de
capacitación en criterios para el uso de la Norma NTP 341.031 G60 de los operadores para
aplicar la metodología de trabajo al presentarse variaciones en los procesos, el equipamiento
antiguo, el uso ineficiente de materia prima y el control manual de la calibración eran las
principales causas del problema. Se diseñaron tres alternativas de solución, las cuales eran:
(a) automatización del proceso mediante alarmas de seguridad; (b) modernización de los
equipos de producción con tecnologías avanzadas; y (c) capacitaciones del personal en
nuevas tecnologías (capacitaciones técnicas, evaluaciones, reforzamiento técnico). Para la
implementación de estas opciones se requiere una inversión de $300,000, los cuales se
recuperarían en tres meses y 13 días, además de que se confirmó la viabilidad económica del
proyecto al obtener un Valor Actual Neto (VAN) de $ 5’967,247.33 o S/ 23’749,644.37, una
Tasa Interna de Retorno (TIR) de 359% y un indicador de Beneficio / Costo de 20.89. | es_ES |
dc.description.abstract | SIDERPERU is a company that belongs to the Gerdau S.A. group, known worldwide
as one of the main steel suppliers, since its products are marketed on five continents and
serve the civil construction, industry, mining, agricultural and automotive sectors. This
business consulting aims to determine what caused the loss related to the metric weight of the
product in the manufacturing process of construction bars, especially with the need to
approach -6% without leaving the NTP341.031 G60 Standard in order to optimize the use of
raw material. In order to identify this problem, it was necessary to hold meetings between the
group of consultants and the managers related to the manufacturing process of the
construction bars, as well as the design of different matrices and the Ishikawa Diagram to
show the causes found. It was determined that the lack of training in criteria for the use of the
NTP 341.031 G60 Standard of the operators to apply the work methodology when there are
variations in the processes, the old equipment, the inefficient use of raw material and the
manual control of the calibration were the main causes of the problem. Three solution
alternatives were designed, which were: (a) automation of the process through security
alarms; (b) modernization of production equipment with advanced technologies; and (c) staff
training in new technologies (technical training, evaluations, technical reinforcement). For
the implementation of these options, an investment of $300,000 is required, which would be
recovered in three months and 13 days, in addition to confirming the economic viability of
the project by obtaining a Net Present Value (NPV) of $5’967,247.33 or S/ 23’749,644.37, an
Internal Rate of Return (IRR) of 359% and a Benefit / Cost indicator of 20.89. | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Pontificia Universidad Católica del Perú | es_ES |
dc.rights | info:eu-repo/semantics/closedAccess | es_ES |
dc.subject | Consultores de empresas--Planificación estratégica | es_ES |
dc.subject | Acero--Industria y comercio | es_ES |
dc.subject | Industria automotriz | es_ES |
dc.subject | Industria minera--Perú | es_ES |
dc.title | Business consulting para la Empresa Siderúrgica del Perú S.A.A. | es_ES |
dc.type | info:eu-repo/semantics/masterThesis | es_ES |
thesis.degree.name | Maestro en Administración Estratégica de Empresas | es_ES |
thesis.degree.level | Maestría | es_ES |
thesis.degree.grantor | Pontificia Universidad Católica del Perú. CENTRUM | es_ES |
thesis.degree.discipline | Administración Estratégica de Empresas | es_ES |
renati.advisor.dni | 09385874 | |
renati.advisor.orcid | https://orcid.org/0000-0001-8121-8658 | es_ES |
renati.author.dni | 16679452 | |
renati.author.dni | 43021495 | |
renati.author.dni | 41518307 | |
renati.author.dni | 29352756 | |
renati.discipline | 413307 | es_ES |
renati.juror | Igor Leopoldo Loza Geldres | es_ES |
renati.juror | Victor Miguel Miranda Arica | es_ES |
renati.juror | Carlos Armando Bazan Tejada | es_ES |
renati.level | https://purl.org/pe-repo/renati/level#maestro | es_ES |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_ES |
dc.publisher.country | PE | es_ES |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#5.02.04 | es_ES |