Show simple item record

dc.contributor.advisorBazan Tejada, Carlos Armando
dc.contributor.authorGonzález Sánchez, Miguel Guillermo
dc.contributor.authorLuque Botto, Carlos Augusto
dc.contributor.authorMartínez Arboleda, Guillermo Arturo
dc.contributor.authorParedes Loayza de Bedoya, Alice Paola
dc.date.accessioned2023-03-24T17:32:40Z
dc.date.available2023-03-24T17:32:40Z
dc.date.created2023
dc.date.issued2023-03-24
dc.identifier.urihttp://hdl.handle.net/20.500.12404/24527
dc.description.abstractSIDERPERU es una empresa que pertenece al grupo Gerdau S.A. conocida como a nivel mundial como una de las principales empresas proveedoras de aceros, dado que se comercializan sus productos en cinco continentes y atienden a los sectores de construcción civil, industria, minería, agropecuaria y automotriz. El presente business consulting tiene como objetivo determinar que provocó la pérdida relacionada con el peso métrico del producto en el proceso de fabricación de barras de construcción, especialmente con la necesidad de acercarse al -6% sin salirse de la norma NTP341.031 G60 para poder optimizar el uso de la materia prima. Para lograr la identificación de este problema, fue preciso que se dieran reuniones entre el grupo de consultores y los gerentes relacionados con el proceso de fabricación de las barras de construcción, así como el diseño de diferentes matrices y el Diagrama de Ishikawa para mostrar las causas halladas. Se determinó que la falta de capacitación en criterios para el uso de la Norma NTP 341.031 G60 de los operadores para aplicar la metodología de trabajo al presentarse variaciones en los procesos, el equipamiento antiguo, el uso ineficiente de materia prima y el control manual de la calibración eran las principales causas del problema. Se diseñaron tres alternativas de solución, las cuales eran: (a) automatización del proceso mediante alarmas de seguridad; (b) modernización de los equipos de producción con tecnologías avanzadas; y (c) capacitaciones del personal en nuevas tecnologías (capacitaciones técnicas, evaluaciones, reforzamiento técnico). Para la implementación de estas opciones se requiere una inversión de $300,000, los cuales se recuperarían en tres meses y 13 días, además de que se confirmó la viabilidad económica del proyecto al obtener un Valor Actual Neto (VAN) de $ 5’967,247.33 o S/ 23’749,644.37, una Tasa Interna de Retorno (TIR) de 359% y un indicador de Beneficio / Costo de 20.89.es_ES
dc.description.abstractSIDERPERU is a company that belongs to the Gerdau S.A. group, known worldwide as one of the main steel suppliers, since its products are marketed on five continents and serve the civil construction, industry, mining, agricultural and automotive sectors. This business consulting aims to determine what caused the loss related to the metric weight of the product in the manufacturing process of construction bars, especially with the need to approach -6% without leaving the NTP341.031 G60 Standard in order to optimize the use of raw material. In order to identify this problem, it was necessary to hold meetings between the group of consultants and the managers related to the manufacturing process of the construction bars, as well as the design of different matrices and the Ishikawa Diagram to show the causes found. It was determined that the lack of training in criteria for the use of the NTP 341.031 G60 Standard of the operators to apply the work methodology when there are variations in the processes, the old equipment, the inefficient use of raw material and the manual control of the calibration were the main causes of the problem. Three solution alternatives were designed, which were: (a) automation of the process through security alarms; (b) modernization of production equipment with advanced technologies; and (c) staff training in new technologies (technical training, evaluations, technical reinforcement). For the implementation of these options, an investment of $300,000 is required, which would be recovered in three months and 13 days, in addition to confirming the economic viability of the project by obtaining a Net Present Value (NPV) of $5’967,247.33 or S/ 23’749,644.37, an Internal Rate of Return (IRR) of 359% and a Benefit / Cost indicator of 20.89.es_ES
dc.language.isospaes_ES
dc.publisherPontificia Universidad Católica del Perúes_ES
dc.rightsinfo:eu-repo/semantics/closedAccesses_ES
dc.subjectConsultores de empresas--Planificación estratégicaes_ES
dc.subjectAcero--Industria y comercioes_ES
dc.subjectIndustria automotrizes_ES
dc.subjectIndustria minera--Perúes_ES
dc.titleBusiness consulting para la Empresa Siderúrgica del Perú S.A.A.es_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
thesis.degree.nameMaestro en Administración Estratégica de Empresases_ES
thesis.degree.levelMaestríaes_ES
thesis.degree.grantorPontificia Universidad Católica del Perú. CENTRUMes_ES
thesis.degree.disciplineAdministración Estratégica de Empresases_ES
renati.advisor.dni09385874
renati.advisor.orcidhttps://orcid.org/0000-0001-8121-8658es_ES
renati.author.dni16679452
renati.author.dni43021495
renati.author.dni41518307
renati.author.dni29352756
renati.discipline413307es_ES
renati.jurorIgor Leopoldo Loza Geldreses_ES
renati.jurorVictor Miguel Miranda Aricaes_ES
renati.jurorCarlos Armando Bazan Tejadaes_ES
renati.levelhttps://purl.org/pe-repo/renati/level#maestroes_ES
renati.typehttps://purl.org/pe-repo/renati/type#tesises_ES
dc.publisher.countryPEes_ES
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#5.02.04es_ES


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record