Show simple item record

dc.contributor.advisorCabello Robles, Oscar Luis
dc.contributor.authorChino Andrade, Renzo Yovanny
dc.date.accessioned2024-04-09T14:39:04Z
dc.date.available2024-04-09T14:39:04Z
dc.date.created2023
dc.date.issued2024-04-09
dc.identifier.urihttp://hdl.handle.net/20.500.12404/27535
dc.description.abstractEsta presente investigación tiene por finalidad de maximizar la recuperación de pilares dejados post minado de tajeos primarios mediante la aplicación de un equipo de perforación con sistema Wassara, que consta de un martillo de fondo propulsado solo con agua y que ofrece mayor longitud y de diámetro de perforación, y menor grado de desviación. De acuerdo con la metodología, esta investigación es del tipo aplicada, enfoque cuantitativo, con un diseño preexperimental y nivel explicativo. En cuanto a resultados se compara un equipo de perforación Jumbo XDTH55UFDR, con un costo unitario de perforación de 41.30 US$/m, costos de perforación de 3.75 US$/t, costo minado de 49.53 US$/t, obteniéndose una recuperación de pilares de 80%, incrementando en 50%, en comparación a la recuperación de pilares de 30% con el Simba 1254; de tal manera, que el diseño de la malla de perforación contempla como parámetros un burden de 2.5 m y un espaciamiento de 2.5 m, longitud máxima de taladros de 80 m y diámetro de perforación de 100 mm, mayor al diámetro de 89 mm del Simba 1254; finalmente con respecto al análisis granulométrico en la voladura, se obtiene un porcentaje pasante P80 de 8.03, teniendo una reducción de 0.23 pulgadas. Concluyendo que con la aplicación del jumbo XDTH55UFDR con sistema Wassara, que tiene mayor longitud y diámetro de perforación en comparación a el Simba 1254, se logra perforar taladros de hasta 80 m de longitud con una desviación del 2.5% y ampliar la malla de perforación de 1.7 x 1.7 a 2.5 x 2.5, por ende, se aumenta en 50% la recuperación de pilares con leyes mayores a 2.2% Cu.es_ES
dc.description.abstractThe purpose of this present investigation is to maximize the recovery of post-mining pillars from primary stopes through the application of drilling equipment with the Wassara system, which consists of a down-the-hole hammer propelled only with water and that offers greater length and diameter of perforation, and less degree of deviation. According to the methodology, this research is of the applied type, quantitative approach, with a preexperimental design and explanatory level. In terms of results, a Jumbo XDTH55UFDR drilling rig is compared, with a unit drilling cost of US$41.30/m, drilling costs of US$3.75/t, mining cost of US$49.53/t, which a pillar recovery of 80% is obtained, increasing by 50%, compared to the pillar recovery of 30% with the Simba 1254; in such a way, that the design of the drilling mesh contemplated as parameters a burden of 2.5 m and a spacing of 2.5 m, a maximum length of drills of 80 m and a drilling diameter of 100 mm, greater than the diameter of 89 mm of the Simba 1254; Finally, with respect to the granulometric analysis in the blasting, a P80 passing percentage of 8.03 was obtained, having a reduction of 0.23 inches. Concluding that with the application of the XDTH55UFDR jumbo with the Wassara system, which has a greater length and drilling diameter compared to the Simba 1254, it is possible to drill holes of up to 80 m in length with a deviation of 2.5% and expand the drilling mesh of 1.7 x 1.7 to 2.5 x 2.5, therefore, increasing the recovery of pillars with grades greater than 2.2% Cu by 50%.es_ES
dc.language.isospaes_ES
dc.publisherPontificia Universidad Católica del Perúes_ES
dc.rightsinfo:eu-repo/semantics/closedAccesses_ES
dc.subjectTaladroses_ES
dc.subjectIndustria mineraes_ES
dc.subjectIngeniería de minas--Perúes_ES
dc.subjectPerforaciónes_ES
dc.titleMaximización en la recuperación de pilares con sistema Wassara en método de minado de taladros largoses_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
thesis.degree.nameIngeniero de Minases_ES
thesis.degree.levelTítulo Profesionales_ES
thesis.degree.grantorPontificia Universidad Católica del Perú. Facultad de Ciencias e Ingenieríaes_ES
thesis.degree.disciplineIngeniería de Minases_ES
renati.advisor.dni40673490
renati.advisor.orcidhttps://orcid.org/0000-0002-8717-1202es_ES
renati.author.dni76742788
renati.discipline724026es_ES
renati.jurorLobo Guillén, Alex Eduardoes_ES
renati.jurorCabello Robles, Oscar Luises_ES
renati.jurorMendieta Britto, Luis Albertoes_ES
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_ES
renati.typehttps://purl.org/pe-repo/renati/type#tesises_ES
dc.publisher.countryPEes_ES
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.07.05es_ES


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record