El sistema se apagará debido a tareas habituales de mantenimiento. Por favor, guarde su trabajo y desconéctese.
Informe Sobre el Expediente N° 005-2005-TSC/19- 2004-TSC-OSINERG
dc.contributor.advisor | Mendiola Flórez, David Enrique Serafín | |
dc.contributor.author | Mantilla Acosta, Carla Elizabeth | |
dc.date.accessioned | 2022-08-09T16:24:14Z | |
dc.date.available | 2022-08-09T16:24:14Z | |
dc.date.created | 2022 | |
dc.date.issued | 2022-08-09 | |
dc.identifier.uri | http://hdl.handle.net/20.500.12404/23003 | |
dc.description.abstract | El presente informe jurídico analizará la controversia generada entre la empresa LUZ DEL SUR S.A.A., contra la empresa ELECTROPERU S.A., respecto a la determinación del precio tope aplicable a los excesos de energía contratada y destinadas al servicio público de electricidad (regulación tarifaria), ello en atención al CONTRATO DE SUMINISTRO PARA EL SERVICIO PÚBLICO DE ELECTRICIDAD, suscrito el 16 de mayo de 1997. Pues bien, en el citado expediente, LUZ DEL SUR S.A.A., en su calidad de empresa distribuidora de energía, alega que los excesos de retiro de la energía contratada, al ser destinadas al servicio público deben de ser facturados a Tarifa en Barra, argumento que es rechazado por la empresa generadora, esto es ELECTROPERU S.A., razón por la cual LUZ DEL SUR S.A.A., presenta una reclamación ante el OSINERG (actualmente, OSINERGMIN), pese a que existía una cláusula arbitral de solución de controversias acordadas por ambas partes; motivo por el cual se analizará el procedimiento y la competencia del Tribunal Administrativo del OSINERG para conocer y resolver la controversia; adicionalmente a ello, se analizará el alcance del servicio público de electricidad, bajo la relevancia de la aplicación de las Tarifas Reguladas en los Contratos de Concesiones Eléctricas, específicamente en aquellos donde la empresa prestadora de energía se ve en la necesidad de “excederse” en los términos del contrato con la finalidad de poder cumplir con la prestación del servicio público de electricidad; asimismo, se analizará la responsabilidad de la empresa distribuidora ante dicho incumplimiento, bajo la perspectiva de la responsabilidad extra contractual, al excederse en los retiros de la energía contratada y, finalmente brevemente se analizará el actuar de LUZ DEL SUR S.A.A., bajo la Teoría de los Actos Propios. | es_ES |
dc.description.abstract | This legal report will analyze the controversy generated between LUZ DEL SUR S.A.A. and ELECTROPERÚ S.A., regarding the determination of the ceiling price applicable to the excess of contracted energy destined to the public electricity service (tariff regulation), in accordance with the SUPPLY CONTRACT FOR THE PUBLIC ELECTRICITY SERVICE, signed on May 16, 1997. In the aforementioned case, LUZ DEL SUR S.A.A., in its capacity as energy distribution company, alleges that the excess withdrawal of contracted energy, since it is destined to public service, should be billed at the Bar Rate, an argument that is rejected by the generating company, ELECTROPERÚ S.A., for which reason LUZ DEL SUR S.A.A.A. filed a claim before the OSINERG (currently, OSINERGMIN), despite the existence of an arbitration clause for dispute resolution agreed by both parties; for this reason, the procedure and competence of the Administrative Court of OSINERG to hear and resolve the dispute will be analyzed; Additionally, the scope of the public electricity service will be evaluated, under the relevance of the application of the regulated tariffs in the electricity concession contracts, specifically in those where the energy company is forced to "exceed" the terms of the contract, in order to comply with the provision of the public electricity service. Likewise, the liability of the distribution company for such breach will be analyzed under the perspective of the non-contractual liability for exceeding the contracted energy withdrawals; finally, the actions of LUZ DEL SUR S.A.A. will be briefly examined under the theory of its own acts. | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Pontificia Universidad Católica del Perú | es_ES |
dc.rights | info:eu-repo/semantics/openAccess | es_ES |
dc.rights.uri | http://creativecommons.org/licenses/by/2.5/pe/ | * |
dc.subject | Servicios públicos | es_ES |
dc.subject | Contratos de suministro | es_ES |
dc.subject | Arbitraje comercial--Legislación--Perú | es_ES |
dc.title | Informe Sobre el Expediente N° 005-2005-TSC/19- 2004-TSC-OSINERG | es_ES |
dc.type | info:eu-repo/semantics/bachelorThesis | es_ES |
thesis.degree.name | Abogado | es_ES |
thesis.degree.level | Título Profesional | es_ES |
thesis.degree.grantor | Pontificia Universidad Católica del Perú. Facultad de Derecho. | es_ES |
thesis.degree.discipline | Derecho | es_ES |
renati.advisor.dni | 41875591 | |
renati.advisor.orcid | https://orcid.org/0000-0002-6365-9545 | es_ES |
renati.author.dni | 43583610 | |
renati.discipline | 215106 | es_ES |
renati.juror | Villegas Vega, Paul | es_ES |
renati.juror | Mendiola Flórez, David Enrique Serafín | es_ES |
renati.juror | Jiménez Murillo, Roberto | es_ES |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_ES |
renati.type | https://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional | es_ES |
dc.publisher.country | PE | es_ES |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#5.05.01 | es_ES |