dc.description.abstractLa presente tesis tiene como objetivo general, identificar la brecha entre los plazos y el costo real con la normatividad para los cinco aspectos vinculados a la facilidad para hacer negocios acorde a la metodología del Banco Mundial, en la ciudad de Paita, Perú. El propósito de la investigación es descriptivo con un enfoque cualitativo, la cual se desarrolla en recopilar información de expertos con diferentes perfiles como gerente general, abogados especializados, contratista, notario especialista, funcionarios de registros públicos, municipal, empresa de distribución eléctrica, OSINERGMIN y juzgado; sobre dos variables principales que son: el tiempo y costo de la tramitología para emprender y poner en operación un negocio en la ciudad de Paita, Piura. El instrumento que se utiliza son las entrevistas en profundidad, basados en cuestionarios estandarizados según la metodología del Doing Business del Banco Mundial, las cuales fueron aplicadas a 17 expertos que voluntariamente contribuyeron con el estudio. A partir de esto, los resultados obtenidos establecen la existencia de brechas entre lo que sucede en la práctica y lo establecido en las normativas vigentes, identificando como principal brecha la que existe en la variable tiempo, del indicador cumplimiento de contrato, llegando a triplicar el número de días en perjuicio a la solución de disputas comerciales. Del mismo modo, se encuentra una brecha en la variable costos del indicador obtención de permisos de construcción, llegando a exceder en la práctica lo establecido en la normativa. Asimismo, los resultados identificaron que la ciudad de Paita tiene un mayor grado de facilidad de hacer negocios con respecto a Lima, debido a una mejor posición en el indicador registro de propiedad. Sin embargo, acusa un menor grado de facilidad con respecto a ciudades del extranjero, debido a que las ciudades foráneas analizadas en este estudio obtienen una mejor posición en todos los indicadores de la metodologíaes_ES
dc.description.abstractThe present thesis aims to identify the gap between the deadlines and the real cost with the regulations for the five aspects related to the ease of Doing Business according to the methodology of the World Bank, in the city of Paita, Peru. The purpose of the research is descriptive with a qualitative approach, which is developed in gathering information from experts with different profiles such as general manager, specialized lawyers, contractor, specialist notary, public records, municipal, electricity distribution company, OSINERGMIN and court; On two main variables that are: the time and cost of the pathology to start and start a business in the city of Paita, Piura. The instrument used is the in-depth interviews, based on standardized questionnaires according to the World Bank's Doing Business methodology, which were applied to 17 experts who voluntarily contributed to the study. From this, the obtained results establish the existence of gaps between what happens in practice and what is established in the current regulations, identifying as the main gap the one that exists in the time variable, of the contractual indicator, reaching a tripling of Number of days to the detriment of the settlement of commercial disputes. Similarly, there is a gap in the variable costs of the indicator obtaining construction permits, reaching to exceed in practice what is established in the regulations. Likewise, the results identified that the city of Paita has a greater degree of ease of Doing Business with respect to Lima, due to a better position in the property registry indicator. However, it shows a lesser degree of ease with respect to foreign cities, because the foreign cities analyzed in this study obtain a better position in all the indicators of the methodologyes_ES
dc.language.isospaes_ES
dc.publisherPontificia Universidad Católica del Perúes_ES
dc.rightsAtribución-NoComercial-SinDerivadas 2.5 Perú*
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/2.5/pe/*
dc.subjectNuevas empresases_ES
dc.subjectEmprendimiento (Administración)es_ES
dc.subjectInvestigación cualitativaes_ES
dc.titleFacilidad para hacer negocios en la Ciudad de Paitaes_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
thesis.degree.nameMagíster en Administración Estratégica de Empresases_ES
thesis.degree.levelMaestríaes_ES
thesis.degree.grantorPontificia Universidad Católica del Perú. CENTRUMes_ES
thesis.degree.disciplineAdministración Estratégica de Empresases_ES
renati.discipline413307es_ES
renati.levelhttps://purl.org/pe-repo/renati/level#maestroes_ES
renati.typehttps://purl.org/pe-repo/renati/type#tesises_ES
dc.publisher.countryPEes_ES
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#5.02.04es_ES


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record

Atribución-NoComercial-SinDerivadas 2.5 Perú
Except where otherwise noted, this item's license is described as Atribución-NoComercial-SinDerivadas 2.5 Perú